Business
Afghanistan gets its first shipment from Iran by railway
The first shipment of Iranian products arrived this week in Afghanistan via a new $75 million railroad that links Iran’s eastern city of Khaf to Herat.
This week’s shipment was dispatched as a trial run to detect possible problems on the route, Iranian media reports stated.
Construction of the railway began in April 2007 and was due to finish in 2009, but was delayed.“The first consignment of goods imported from Iran which included 500 tonnes of cement entered the country [Afghanistan] via the Herat-Khaf railway,” an Afghan official from Herat said.
The 130 km long Khaf-Herat railway is strategically important as it gives Afghanistan easy access to Iranian ports at Chabahar and Bandar Abbas.
According to the Afghanistan Railway Authority, the railway forms one of its most important regional connectivity projects, as it will provide the land-locked country with a link to Iranian ports and rail networks, Turkey, and Europe, Iranian media stated.
Freight traffic is predicted to be around two million tonnes a year, with imports to include oil, construction materials, and food and exports to include grain, dried fruit, plants and medical items.
The operation of a passenger service via this railway is also being considered. According to initial studies, passenger traffic could reach 321,000 passengers in a year.
Iran’s Foreign Ministry spokesman Saeed Khatibzadeh said that “while the Khaf-Herat railway is to be inaugurated in the coming days as a symbol of great cooperation between the two countries, it is inevitable to take care of the suspicious actions of the ill-wishers of our relations [between Tehran and Kabul]”.
Mehr news agency reported that Iran’s exports to Afghanistan are projected to reach $2.7 billion by March next year.
Business
New Afghanistan-China transport corridor launched via Turkmenistan
A new multimodal freight corridor linking China and Afghanistan via Turkmenistan has been officially launched, aiming to improve the speed and efficiency of overland cargo transportation across Central Asia.
According to the Turkmenistan Embassy in London, the country has become part of a newly established route designed to accelerate freight deliveries between China and Afghanistan.
The corridor, developed with the involvement of Uzbekistan Railways’ subsidiary Uztemiryulcontainer, covers approximately 7,400 kilometers and is expected to reduce transit time to around 30 days, improving overall logistics efficiency.
Under the new route, containers are transported by rail from China through the Altynkol station in Kazakhstan, continuing via Uzbekistan to a logistics hub in Bukhara. From there, cargo is transferred to road transport and moved across Turkmenistan before reaching Herat in Afghanistan.
Officials say the new system integrates rail and road networks into a unified logistics chain, making transport more predictable and efficient.
Business
Uzbekistan launches new cargo corridor linking China and Afghanistan
From Uzbekistan, shipments will be transferred onto trucks and transported across Turkmenistan en route to Herat in western Afghanistan.
Uzbekistan’s national railway operator has announced the launch of a new multimodal freight route designed to strengthen logistics links between China and Afghanistan via Central Asia.
According to Trend news agency the new corridor will see container used goods transported by rail from China through Kazakhstan’s Altynkol station into Uzbekistan. Cargo will then be handled at the Bukhara logistics centre, operated by Uztemiryulkonteyner, before continuing its journey by road.
From Uzbekistan, shipments will be transferred onto trucks and transported across Turkmenistan en route to Herat in western Afghanistan.
Previously, freight along this trade corridor was largely routed via sea from China to Iran’s Bandar Abbas port, before continuing overland into Afghanistan. The new overland alternative is expected to streamline logistics and improve reliability.
Covering approximately 7,400 kilometres, the route is projected to reduce transit times to around 30 days, offering a more efficient option for regional cargo movement between East Asia and South Asia.
Business
Afghanistan presses Chinese contractor over delays in Mes Aynak copper project
During the meeting, the MCCT president assured that pending operations would be implemented in line with contractual provisions.
Afghanistan’s Minister of Mines and Petroleum Hedayatullah Badri has raised concerns over delays in the Mes Aynak copper project during a meeting with Chinese officials and company representatives.
The talks brought together the Chinese ambassador, the head of MCCT, and the chairman of MJAM, the contractor responsible for the major mining project. Discussions focused on the lack of progress and the failure to implement key obligations outlined in the mining contract.
Officials reviewed outstanding commitments that had previously been formally communicated to the company, with Afghan authorities stressing that agreed mining activities have yet to be carried out.
During the meeting, the MCCT president assured that pending operations would be implemented in line with contractual provisions.
Badri emphasized that the contractor must fully comply with all terms and conditions of the agreement, as well as follow the ministry’s formal directives. He called for concrete and immediate steps to accelerate the project and ensure full implementation of planned activities.
Mes Aynak copper project
The Mes Aynak copper deposit, located about 40 kilometres southeast of Kabul, is one of the world’s largest untapped copper reserves, with an estimated 11 million tonnes of copper.
The project was awarded to a Chinese consortium led by state-run Metallurgical Corporation of China in 2007 and formally signed in 2008 under a 30-year lease. Valued at roughly $3–4 billion, it was the largest foreign investment in Afghanistan at the time.
The agreement included plans to develop the mine along with major infrastructure such as railways, roads, and power facilities, although several of these commitments were later delayed or renegotiated.
Despite its scale, the project has seen little progress over the past decade. Work slowed significantly around 2013–2014, with ongoing delays attributed to security concerns, lack of infrastructure, and disputes over contractual terms. The presence of a significant archaeological site at Mes Aynak — containing ancient Buddhist remains — has also complicated development, requiring extensive preservation efforts.
Afghan authorities have repeatedly raised concerns over the contractor’s failure to meet key obligations and timelines, while Chinese companies have cited security and logistical challenges as major obstacles.
Since the political changes in Afghanistan in 2021, the project has repeatedly come under focus, with officials pushing to revive stalled mining initiatives as part of broader economic recovery efforts. Chinese firms have signaled continued interest, but meaningful progress has yet to materialize.
The project remains strategically important, with the potential to generate significant revenue, create jobs, and support Afghanistan’s long-term economic development — if longstanding challenges can be resolved.
-
Business1 day agoNew Afghanistan-China transport corridor launched via Turkmenistan
-
Latest News4 days agoPakistan’s Achakzai pushes for Afghanistan dialogue amid economic strain
-
Business3 days agoAfghanistan presses Chinese contractor over delays in Mes Aynak copper project
-
Business3 days agoUzbekistan launches new cargo corridor linking China and Afghanistan
-
Latest News4 days agoFood prices surge 20% in Afghanistan as Hormuz crisis disrupts supply routes
-
Latest News5 days agoAustrian interior minister heads to Uzbekistan to finalize Afghan deportation deal
-
Sport5 days agoAll eyes on Jeddah as AFC U-17 Asian Cup 2026 kicks off
-
International Sports4 days agoMumbai Indians pull off record chase as IPL action continues
